Seasonal Booking Workflow
The seasonal booking workflow was built to handle the surge of water allocation requests during spring melt and dry summer months. Instead of a generic queue, the system applies catchment-level priority rules based on real-time reservoir levels and industrial withdrawal permits. The implementation required reworking the existing permit validation module and adding a calendar-based scheduler that flags overlapping bookings before they reach the approval stage. The result is a booking process that reduces manual review time by roughly 40% during peak season, while maintaining full audit trails for Canada Water Act reporting. Supporting materials include the revised permit validation logic, the scheduler interface mockups, and the updated operational procedure document.